Gumusut-Kakap Semi-Submersible Floating Production System Fabrication and Installation of Structural Columns and Pontoon
Owner
:
MISC Berhad
HOST CONSTRUCTION
:
Sabah Shell Petroleum Co. Ltd.
MAIN CONTRACTOR
:
Malaysia Marine & Heavy Engineering Sdn. Bhd.
Location
:
MMHE Pasir Gudang, Johor.
Our Projects
:
Gumusut-Kakap Semi-Submersible Floating Production System Fabrication and Installation of Structural Columns and Pontoon.
Fabrication, Installation and Testing of Hull Piping Systems
Fabrication, Installation of Hull Appurtenances
Fabrication, Installation and Testing of Hull HVAC Systems
Installation of Hull Static and Rotating Equipment
SCOPE OF WORK
:
New fabrication, installation and testing of GK hull piping systems c/w hull penetration sleeves and pipe supports (ASME IX); such as ballast bilge, vent, process and utility piping, riser piping and integration spools to Topside modules. Piping materials constructed comprised of copper-nickel, stainless steel, galvanised steel and low-temp carbon steel.
Fabrication and installation of hull appurtenances c/w supports (AWS D1.1) such as Umbilical Pull Tube, Caisson, Casing, Draft Sensor, Riser Clamps and Support.
Fabrication, installation and testing of GK Hull HVAC system c/w duct supports, which comprised of galvanised steel spiral duct and carbon steel duct vent lines.